Reindustrialize
America.

Lakesong Technology Park is a planned 300 MW advanced manufacturing campus on 130 acres in Midlothian, Texas.

300MW

planned total campus capacity

226MW

planned behind-the-meter generation

130ac

Midlothian, Ellis County, Texas

Zero

drinking water designed for cooling

All figures are development targets

01Advanced manufacturing

Built for the companies reindustrializing America

American industry is short on equipment, not ambition. Lakesong Technology Park is being developed for the manufacturers that close that gap.

The campus is planned for advanced manufacturing: transformers and switchgear, power electronics, thermal systems, batteries, robotics, and defense components.

Skilled, well-paid jobs. A supply chain that stays in Ellis County.

Intended use
Advanced manufacturing
Job profile
Skilled, on-site, durable

Who we are built for

Electrical equipment

Transformer, switchgear, and breaker manufacturing, where power on site is the constraint.

Energy & grid hardware

Fuel cell, battery, and power electronics production lines scaling into national demand.

Precision & industrial

Machining, fabrication, and assembly operations that need heavy power and clean utilities.

Defense & aerospace suppliers

Domestic supply chain manufacturers seeking secure, resilient campuses in Texas.

Target tenant categories are illustrative of the uses the campus is being designed for and do not represent executed leases or commitments.

02Power

A planned 300 MW, powered behind the meter.

A 74 MW ERCOT interconnection paired with roughly 226 MW of clean, non-combustion generation built on the campus itself.

Power generated where it is consumed, on the tenant's schedule instead of the interconnection queue's.

Advanced manufacturing needs large, firm, early power, and transmission alone is slow to deliver it. On-site generation is modular and intended to be added in step with tenant demand rather than speculatively.

On-site power is planned around next generation fuel cells. Unlike gas turbines, they generate through an electrochemical process rather than combustion, so they run clean and quiet, with no flame, minimal emissions, and a low noise profile at the property line.

The campus is subject to Texas SB6 and is being designed so that campus load, including on-site generation, can be curtailed when ERCOT is strained, allowing the project to act as a flexible asset to the regional grid.

74 MW
Grid interconnection
226 MW
Behind the meter
300 MW
Curtailable under SB6
Capacity rampSB6 curtailable
Phase 1Q3 2028
Phase 2Q3 2029
Phase 3Q3 2030
300 MW total capacity

Target energization of the 74 megawatt ERCOT interconnection, bringing planned campus capacity to approximately 300 megawatts.

03Water & land

Water that circulates. Land that stays land.

Most large industrial campuses treat water as a once-through consumable. Lakesong is designed differently.

The same water circulates and recirculates rather than being consumed.

Cooling systems are planned to be closed-loop and high-efficiency. The campus is designed to use no drinking water for cooling operations, in any season, so the water Midlothian families depend on stays where it belongs.

Roughly a third of the 130 acre site is planned to remain open space, with creeks, floodplain, and wetlands left undisturbed. Dark-sky-compliant lighting, generous setbacks, and landscaped screening are proposed to keep the campus a quiet neighbor.

~80 ac
Planned development area
~50 ac
Planned open space
75–100 ft
Planned setbacks and buffers
Cooling loopNo drinking water
Municipal drinking waterMidlothian familiesNo campus drawin any seasonManufacturing campusProcess and comfort coolingClosed-loop coolingRecirculates, does not consumeTHE SAME WATERcirculating continuously
Zero
Drinking water for cooling
~50 ac
Planned open space
04The site

130 acres in Midlothian, Ellis County.

Inside the DFW metro, with highway and airport access and a deep industrial labor pool. Boundaries shown are preliminary and subject to final survey and approvals.

Loading map…

Surveyed parcel boundary · illustrative

05Community questions

Straight answers for our neighbors.

Midlothian residents have asked good questions about what is planned here. These are the answers as they stand today; details will evolve through the public process.

Lakesong Technology Park is being developed as an advanced manufacturing campus, for companies that build physical equipment such as transformers, switchgear, power electronics, thermal systems, and related components.

Manufacturing and assembly buildings, supporting utility infrastructure, on-site power generation, and site improvements, phased over several years. Building layouts and tenants are not final and remain subject to permitting and market conditions.

Cooling is planned as a closed-loop system that circulates and reuses its water rather than consuming it continuously. The intent is a campus that does not draw on the community's drinking water supply for cooling in any season.

The plan calls for roughly 74 MW of grid interconnection and roughly 226 MW of clean behind-the-meter generation built on site. Because most of the campus load is served by generation the project pays for itself, the campus is designed to lean on the grid less than a comparable all-grid user.

The campus is designed to be curtailable consistent with Texas SB6. In a grid emergency the site can reduce or drop its grid load and shift to on-site generation, which is intended to make it a help to the region rather than a burden during peak events.

Manufacturing traffic is shift-based rather than continuous, and site planning includes setbacks, screening, and dark-sky-minded lighting. Specific mitigation commitments will be established through the local permitting and zoning process.

Roughly a third of the 130-acre site is planned to remain open space, with creeks, floodplain, and wetland areas left undisturbed.

Advanced manufacturing brings production, maintenance, and technical roles, electricians, machinists, welders, and controls technicians, along with construction work during the buildout. Job counts will depend on the end users who locate here.

Use the contact section on this page. We would rather hear from neighbors early than late, and we intend to participate in public meetings throughout the approval process.

Reindustrialize America

Reindustrializing America is not a slogan. It is a vision and rally call for America.

Texas is defining what the next generation of large-load development should look like: water-efficient closed-loop cooling, projects that carry their own infrastructure costs, and developments that operate as good neighbors. Lakesong Technology Park is being developed to that standard.

06Contact

Build here.

Manufacturers, developers, capital partners, and community leaders: reach out and our team will follow up. Detailed specifications and indicative terms are available under NDA.

Location

Midlothian, Ellis County, Texas

Developer

Huffines Powered Land